Under Saudi Arabia’s Vision 2030, the nation is rapidly expanding its power infrastructure to support growing industrial and residential demand.
SWT delivered a black start power solution for two flagship combined cycle power plants (30 x 1800MW), located northeast of Riyadh.
Phase I deployment includes 28+2 units, demonstrating strong scalability and rapid execution capability for large-scale projects.

Built for one of the world’s harshest operating environments:
- Reliable start-up at up to 55°C
- Stable performance under sandstorms and high-wind desert conditions
- Ultra-quiet enclosure — 85 dB @ 1 meter
Smart. Integrated. Reliable.
- Fully automated control from start-up to grid synchronization
- Seamless integration with leading engine brands
- Multi-layer interlock protection to prevent misoperation
Delivering Performance at Scale
With fast-track delivery and proven expertise in large-scale international projects, SWT ensured seamless integration with EPC partners and full compliance with project specifications.





