Simandou 25MW Mining Power Plant Project

The Simandou mining power plant project in Guinea is designed to support power supply for mining operations. The project information identifies it as a 25MW mining power plant, with phase-I technical planning around an 18MW / 10.5kV diesel power station and future expansion to 40MW. The system adopts 6 units of medium-speed generator sets rated at 4347kW each.

 

微信图片 20260826105924 412 152

微信图片 20260826105956 413 152

微信图片 20260826110029 414 152

 

Project Overview Table

Project Name Simandou 25MW Mining Power Plant Project
Location Simandou, Guinea
Application Mining power plant
Phase-I System 18MW / 10.5kV diesel power station according to project notes
Future Expansion Planned expansion to 40MW during phase II
Generator Units 6 units
Unit Rating 4347kW
Engine Platform MAN-9L32/40 medium-speed engine platform / CMP-MAN listed as engine brand in the project table
Fuel Diesel in early stage; heavy fuel oil / biodiesel may be used according to project requirements
Power Delivery 10.5kV generation system with 35kV supply to the mine through 2 × 50MVA, 35/10kV step-up transformers
Status Under site construction / project execution according to the project table

 

Project Background

The Simandou mining project requires a dedicated power plant to support phase-I mine construction and operation. In remote mining areas, stable power supply is essential for production equipment, auxiliary facilities, communication systems and site infrastructure. The power station must also consider future capacity expansion as the mining project develops.

SWT Solution

The project is planned with a fixed diesel power station using medium-speed generator sets. The phase-I system adopts a 10.5kV generation design, with generator units connected to sectionalized 10.5kV busbars. Through 2 × 50MVA, 35/10kV step-up transformers, the power station supplies electricity to the mine at 35kV voltage level. The design also considers phase-II expansion, when the power station capacity is planned to increase to 40MW.

Key Features

  • Mining power plant solution for a remote large-scale mining project.
  • 6 × 4347kW medium-speed generator sets based on MAN-9L32/40 engine platform.
  • 5kV generation system with sectionalized busbar arrangement.
  • 35kV power supply to the mine through 2 × 50MVA step-up transformers.
  • Designed with supporting systems including fuel, lubricating oil, cooling, intake and exhaust, control and electrical systems, and black start system.

Project Value

This project demonstrates SWT’s capability in medium-speed power plant system design and project execution for remote mining applications. Compared with standard generator set supply, mining power plant projects require integrated planning for auxiliary systems, logistics, construction, commissioning and long-term operation under demanding site conditions.